COMMERCIAL PROJECT / BICTON, WA / 2025

St Christophers Bicton

Waterseal repaired and waterproofed a suspended concrete awning roof at St Christophers in Bicton, including the sensitive junction beside a heritage-listed stained-glass window.

CLIENT
St Christophers
LOCATION
Bicton, WA
COMPLETED
2025
DELIVERY
Commercial Delivery
PROJECT CASE STUDY

Durable roof waterproofing resolved a difficult heritage interface.

Waterseal repaired and waterproofed a suspended concrete awning roof at St Christophers in Bicton, including the sensitive junction beside a heritage-listed stained-glass window.

THE CHALLENGE

A failed roof slab met a protected stained-glass window.

The suspended concrete awning roof required repair and a durable waterproofing system. At its edge, the slab terminated against a heritage-listed stained-glass window whose deteriorated sill and side details could not simply be replaced.

THE SOLUTION

Polyurea waterproofing with carefully resolved perimeter detailing.

Waterseal stripped the old membrane, repaired the slab and applied a long-lasting polyurea system. The team also developed a compatible repair detail at the junction between the window frame and the concrete slab.

Project Gallery

Site photography showing existing conditions, preparation, installation and completed detailing.

THE OUTCOME

The roof and heritage interface were protected together.

The renewed membrane and corrected frame-to-slab details stopped the reported leakage while retaining the heritage window assembly.

2025
SPECIALIST WATERPROOFING FOR COMPLEX PROJECTS

Planning a commercial waterproofing project?

Bring Waterseal in early for practical advice, clear scope development and specialist waterproofing delivery across Perth and Western Australia.